Ethane recovery uses cryogenic processing to separate ethane and heavier hydrocarbons from natural gas streams for petrochemical feedstock, NGL production and other downstream applications.
Recovering ethane requires lower processing temperatures and deeper liquids extraction than C3+ recovery alone. The business case depends on feed gas composition, available pressure, ethane recovery targets and downstream infrastructure capable of handling the recovered C2+ product.
5Blue engineers ethane recovery systems around each application’s gas composition, flow rate, inlet conditions, C2+ recovery requirements and downstream product objectives.
Our process engineering team evaluates the complete cryogenic process, including upstream treating requirements, available pressure and downstream product handling, to develop an integrated recovery system. Modular fabrication, assembly and testing at our Alberta facilities support project execution before delivery to site.
Ethane recovery is suited to rich gas streams where ethane has sufficient product value to justify deeper cryogenic processing and the infrastructure required to handle the recovered C2+ stream.
Consider ethane recovery when:
Ethane recovery uses many of the same core components as cryogenic LPG recovery, but operates at colder temperatures and is built around a demethanizer rather than a deethanizer, so ethane is recovered with the liquid product instead of remaining in the residue gas.
Typical equipment includes:
Part of
Parent system category covering recovery of valuable hydrocarbon liquids from natural gas streams.
C3+ recovery focused on propane, butane and heavier hydrocarbon liquids.
Deeper C3+ recovery using cryogenic expansion where higher propane-plus recovery is the primary objective.
Deep dehydration upstream of cryogenic processing to achieve the low water content required for low-temperature operation.
Share your gas composition, flow rate, operating conditions and C2+ recovery objectives. Our team can evaluate your ethane recovery requirements and develop a process configuration around your feed conditions and downstream product requirements.
Complete the form below and we will follow up with you promptly.
"*" indicates required fields

706-25th Ave,
Nisku, Alberta,
Canada T9E 0G6
P: 780.955.2040
F: 780.955.7479
421-7th Ave SW,
30th Floor
Calgary, Alberta,
Canada T2P 4K9
P: 780.955.2040
F: 780.955.7479
2303-8th Street
Nisku, Alberta,
Canada T9E 7Z3
P: 780.955.2040
F: 780.955.7479
655-30th Avenue
Nisku, Alberta,
Canada T9E 0R4
P: 780.955.2040
F: 780.955.7479
© 2026 5Blue Process Equipment, Inc. All rights reserved. | Privacy Policy | Sitemap